מונה מים חכם של GCT

Design and Execution Division

GCT

GCT

Design and Execution Division

About Us

GCT, part of Gaon Group, specializes in developing advanced hardware and software systems for smart water management and metering (AMR/AMI). The company develops communication systems, control software and transmitting water meters that together form the market's leading end-to-end solutions for smart water networks (Smart Grid). Through an open, flexible interface that integrates with a range of manufacturers, GCT gives water utilities, municipalities, industry and agriculture a complete technology solution that enables full control, resource optimization and significant cost savings, along with a fast, precise response to changing market needs.

Leading at Gaon

Why Us?

  • Advanced AMI/AMR Technology

    In-house development of hardware, control software and advanced communication systems that enable remote reading, real-time monitoring and smart, efficient water network management.

  • Open System, Lower Costs

    Our open interface allows full integration with existing equipment and systems from different manufacturers, giving complete freedom in choosing equipment and avoiding costly upgrades.

  • Customer-Focused, Fast Response

    Our software and hardware development teams work closely with the field teams at Madey Vered, ensuring continuous technological development and an especially fast response to the changing needs of the market and our customers.

Selected Projects

Leading at Gaon

From building the metro infrastructure and the Arava water systems, to the pneumatic conveying revolution and the energy sector. A glimpse into Gaon Group's front line.

Elad Northern Line Project 2025-6

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Elad Northern Line Project
April 26 26 meters
Arava Water Conveyance Project 2025-6

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Arava Water Conveyance Project
April 26 26 meters
Steel Pipes for Main Lines 2026-7

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Steel Pipes for Main Lines
April 26 26 meters
Ganigar WWTP Upgrade 2024-5

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Ganigar WWTP Upgrade
April 26 26 meters

Contact

Apply

Contact Us

Thanks, we got your message and will get back to you soon.

Apply for a Position

Thanks, we received your application and will get back to you soon.