משאית עפר ומעמיס בעבודות חפירה ועבודות עפר בשטח פתוח

Design and Execution Division

נחמני

Nachmani

Strength in depth

Design and Execution Division

About Us

The company began in 1966 as a family business and has since grown into one of the most experienced and leading civil engineering companies in Israel. It carries out complex projects at the national level, using the most modern and advanced equipment and technologies available today, while taking meticulous care of existing infrastructure.

Leading at Gaon

Our Services

  • צינור פוליאתילן שחור מושחל בתעלה בעבודת קידוח אופקי

    Polyethylene Pipe Drilling (HDD)

    Steerable horizontal drilling for complex routes, at lengths of up to 1.5 km and diameters from 1 to 48 inches and more.

  • צוות עובדים מוריד צינור בטון גדול לבור דחיקה

    Concrete Pipe Jacking

    An advanced method for laying massive infrastructure without opening the ground surface, at diameters of 1 to 3.1 meters and lengths of more than 300 meters.

  • מכונת דחיקה אופקית מחדירה צינור פלדה בתוך תעלה

    Steel Pipe Jacking (CFA / Auger Boring)

    Precise horizontal insertion of steel casings and steel pipes at diameters of 12 to 80 inches, for projects of 100 meters and more.

Selected Projects

Leading at Gaon

From building the metro infrastructure and the Arava water systems, to the pneumatic conveying revolution and the energy sector. A glimpse into Gaon Group's front line.

Elad Northern Line Project 2025-6

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Elad Northern Line Project
April 26 26 meters
Arava Water Conveyance Project 2025-6

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Arava Water Conveyance Project
April 26 26 meters
Steel Pipes for Main Lines 2026-7

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Steel Pipes for Main Lines
April 26 26 meters
Ganigar WWTP Upgrade 2024-5

Supply and execution of advanced infrastructure solutions, meeting the most demanding standards.

Ganigar WWTP Upgrade
April 26 26 meters

Contact

Apply

Contact Us

Thanks, we got your message and will get back to you soon.

Apply for a Position

Thanks, we received your application and will get back to you soon.